Img_3878Img_3879Img_3880Img_3881Img_3884

This is the first show in the Belgrade’s B2 auditorium to use the “short-traverse” set up. So first, the usual seating arrangement had to be struck and then the stage crew levelled the auditorium floor. Once that was done the set could come out of the van and into the theatre. Dancefloor down first, then steel frameworks into position, with only a few hiccups…Cast are due to rehearse onstage tomorrow and for the rest of the week, with lighting being rigged and focussed around them. Teching begins next Monday.

Advertisements